Paslode IMPULSE IMLi200 Manuel D'utilisation page 13

Table des Matières

Publicité

Inserting Fuel Cell
Inserting the metering valve/fuel cell assembly into the
Impulse Brad Nailer is very simple. To begin, press up at
the bottom of the actuator cover and pivot outward to open.
The cover will swing out of the way.
2 PULL OUT
Next, with the metering valve stem pointed toward the front
of the tool, insert the metering valve/fuel cell assembly.
1 PRESS UP
Fuel Cell and Metering Valve
As you slide the metering valve/fuel cell assembly into the
Impulse Brad Nailer, you will notice a yellow adapter at the
top of the cylinder pocket. As shown in the illustration, this
adapter is designed to ensure that the metering valve stem
is properly aligned with the small hole, or orifice, that leads
to the combustion chamber. Insert the metering valve stem
into the orifice of the yellow-colored adapter.
Yellow
Adapter
Close the actuator cover to complete the loading of fuel in
the Impulse Brad Nailer. Do this by swinging it up and over
the fuel valve/cylinder assembly, and pushing down until
the actuator cover snaps into position.
Fuel Cell
Yellow Metering
Valve
Metering Valve Stem
2. PUSH DOWN
1 SWING BACK
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

903700

Table des Matières