Napoleon Riverside Série Manuel D'installation Et D'opération page 27

Masquer les pouces Voir aussi pour Riverside Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.
Place log #5 along the front left side of the
grate and then pull it forward, ensuring the log
notches align with the grate posts.
7.
Place log #7 crosswise, ensuring the top rests
on the top right notch of log #1 and the bot-
tom rests on the rear notch of log #4.
9.
Place log #9 crosswise, ensuring the top rests
on the top left notch of log #8 and the bottom
rests on the top left notch of log #5.
6.
Place log #6 on the top notch of log #1,
ensuring the charcoal end of log #6 faces
forward.
8.
Place log #8 crosswise, ensuring the top rests
on the top left notch of log #1, and the bottom
rests on both the top left notch of log #4 and
the top right notch of log #5.
fi nishing
EN
27
W415-2978 / A / 10.07.21

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Riverside gss36cfneRiverside gss36cfpe

Table des Matières