i
EN
9. Flush-mounted installation
9.
Screw the belt winder into place.
Slide the belt winder into the belt
box and screw it into place with the
included installation screws.
IMPORTANT
Pay attention to the connection
cables. Feed both connection ca-
bles along the bottom of the belt
winder and through the notches in
the installation frame, as described
on page 66.
10.
Open the operating panel.
The operating panel can be
opened by pressing and levering
with a flat-headed screwdriver.
68