5.1

horizontal installation

WARNING
!
The fi restop assembly must be installed with the vent shield to the top.
Terminals must not be recessed into a wall or siding more than the depth of the return fl ange of the mounting
plate.
This application occurs when venting through an exterior
wall. Having determined the correct height for the air
terminal location, cut and frame a hole in the exterior wall,
as illustrated, to accommodate the fi restop assembly. Dry
fi t the fi restop assembly before proceeding to ensure the
brackets on the rear surface fi t to the inside surface of the
horizontal framing.
The vent shield must be installed to the full depth of the
combustible wall. The length of the vent shield may cut
shorter for combustible walls that less than 6" (152mm)
thick.
note:
Bend the tabs for reduced side clearances or move
the shield for reduced top clearances. Do not fi ll
the air space between the fi restop spacer and the
exterior wall with any type of insulating material (i.e.
spray foam).
A. Apply a bead of caulking (not supplied) around the
corner edge of the inside surface of the fi restop
assembly, fi t the fi restop assembly to the hole and
secure using 4 screws.
B. Once the vent pipe is installed in its fi nal position, apply red RTV silicone (W573-0002) (not supplied)
between the pipe and the fi restop.
5.2

vertical installation

This application occurs when venting through a roof. Installation kits for
various roof pitches are available from your authorized dealer / distributor.
See the "accessories" section to order specifi c kits required.
A. Determine the air terminal location, cut and frame a square opening,
as illustrated, in the ceiling and the roof to provide the minimum 1"
(25mm) clearance between the vent pipe and any combustible material.
Try to center the vent pipe location midway between two joists to
prevent having to cut them. Use a plumb bob to line up the center of
the openings. A vent pipe shield will prevent any materials such as
insulation, from fi lling up the 1" (25mm) air space around the pipe. Nail
headers between the joist for extra support.
B. Apply a bead of caulking (not supplied) to the framework or to the
Wolf Steel vent pipe shield plate or equivalent (in the case of a fi nished
ceiling), and secure over the opening in the ceiling. A fi restop must be
placed on the bottom of each framed opening in a roof or ceiling that
the venting system passes through. Apply a bead of caulking all around
and place a fi restop spacer over the vent shield to restrict cold air from
being drawn into the room or around the fi replace. Ensure that both
spacer and shield maintain the required clearance to combustibles.
Once the vent pipe is installed in its fi nal position, apply red RTV
silicone (W573-0002) (not supplied) between the pipe and the fi restop
assembly.
C. In the attic, slide the vent pipe collar down to cover up the open end
of the shield and tighten. This will prevent any materials, such as
insulation, from fi lling up the 1" (25mm) air space around the pipe.
venting installation
VENT
SHIELD
CAULKING
Vent
Caulking
shield
FIRESTOP
SPACER
Firestop
spacer
CAULKING
Finishing
MATERIAL
material
note:
The above is for illustration purposes only. Vents do
not always pass through center of frame.
16.2A
16.5A
ADD
14"
ADD
14"
(35.6CM)
HEIGHT
WIDTH
(35,6CM)
height
width
DETERMINE
THE
Determine
CORRECT
the
correct
HEIGHT
height
FINISHING
Firestop
underside
of joist
Caulking
Vent Pipe
Shield
Vent
Pipe
Collar
Vent
Pipe
Shield
W415-1285 / H / 08.07.18
EN
25

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Ascent multiface bhd4pnAscent multiface bhd4stnAscent multiface bhd4pgnAscent multiface bhd4stgnAscent multiface bhd4pfcnAscent multiface bhd4stfcn ... Afficher tout

Table des Matières