Connection Of Piping - Outdoor - Friedrich MR24DY3JMA Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Flaring Work and Connection of Piping

Connection of piping - Outdoor

Align the center of the piping and sufficiently
tighten the flare nut by hand.
Connecting pipe order
1) ROOM A~C gas side pipe
2) ROOM A~C liquid side pipe
Finally, tighten the flare nut with torque wrench
until the wrench clicks.
• When tightening the flare nut with torque
wrench ensure the direction for tightening fol-
lows the arrow on the wrench.
Outside diameter
mm
inch
Ø6.35
1/4
Ø9.52
3/8
Ø12.7
1/2
Ø15.88
5/8
Ø19.05
3/4
22
Torque
N. m
kgf.m
14~18
1.4~1.8
10~13
34~42
3.5~4.3
25~31
49~61
5.0~6.2
36~45
69~82
7.0~8.4
51~60
100~120 10.0~12.2
73~88
Outdoor unit
Main liguid
side valve
lbf.ft
Liquid
side piping
1/2 inch(Ø12.7)
Connector
Main gas
side valve
Gas side
piping
ROOM A
ROOM B
ROOM C

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mr36tqy3jmaMr49dey3jm

Table des Matières