Direct Vent Closet And Alcove Installation - Rinnai E50CRN Manuel D'installation

Chaudière gaz à condensation haut rendement
Masquer les pouces Voir aussi pour E50CRN:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

12" (300 mm)
minimum
12" (300 mm)
minimum
Terminal positions PVC figure 16
6.7.5
!
WARNING
1"(25mm) minimum clearance
around vent pipes
15"
386mm
10"
254mm
2"
50mm
1"(25mm) minimum clearance
around hot water pipes
Closet installation
38
12" (300 mm)
minimum
EXHAUST
INTAKE
12" (300 mm)
minimum
12" (300 mm)
minimum

Direct vent closet and alcove installation

For closet and alcove installation, CPVC material, instead of PVC, must be used
in a closet/alcove structure. Failure to follow this warning could result in fire,
personal injury, or death.
Rinnai strongly suggests the use of PPs venting for all closet and alcove
installations. For non direct vent room air applications see sections 6.7.5 and
6.7.8.
6"
148mm
2"
50mm
8"
8"
200mm
200mm
figure 17
1"(25mm) minimum clearance
11"
268mm
10"
254mm
Closed door
1"
25,4mm
50mm
1"(25mm) minimum clearance
around hot water pipes
Alcove installation
around vent pipes
15"
386mm
2"
8"
200mm
200mm
figure 18
6"
148mm
11"
268mm
Open front
6"
152mm
2"
50mm
8"

Publicité

Chapitres

Table des Matières
loading

Table des Matières