Schéma De Tuyauterie Pour L'installation De Base - Rinnai V53De Manuel D'installation Et D'utilisation

Masquer les pouces Voir aussi pour V53De:
Table des Matières

Publicité

Schéma de tuyauterie pour l'installation de base
Conduite d'approvisionnement
3/4" Hot Water Supply Line
en eau chaude 1,9 cm (3/4 po)
3/4" Ball Valve
3/4" Union
Check Valve
Pressure Relief Valve
10
For Building Fixtures
KEY
Pressure Regulator
Circulating Pump
Boiler Drain Valve
S
Solenoid Valve
Rinnai
Chauffe-eau
Water Heater
Conduite d'approvisionnement en eau froide 1,9 cm (3/4 po)
This is not an engineered drawing. It is intended only as a guide and not
as a replacement for professionally engineered project drawings. This
drawing is not intended to describe a complete system. It is up to the
contractor/engineer to determine the necessary components and
configuration of the particular system being installed. This drawing does
not imply compliance with local building code requirements. It is the
responsibility of the contractor/engineer to ensure installation is in
accordance with all local building codes. Confer with local building
officials before installation.
Manuel V53De
Rinnai
Equipment List
Rinnai
Water Heaters
RIK-KIT (Optional)
(3/4" Fittings Include:
2 Unions, 2 Ball Valves,
2 Drain Valves and
1 Pressure Relief Valve.)
Raccord de gaz 1,9 cm (3/4
po)
Approvisionnement en gaz
QTY
1
1

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Reu-am1620wd-us

Table des Matières