Rinnai E50CRN Manuel D'installation page 69

Chaudière gaz à condensation haut rendement
Masquer les pouces Voir aussi pour E50CRN:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Flushing
Draining
Flushing and draining
4. Connect drain hose (H3) to service valve (V2).
5. Pour approximately 4 gallons of virgin, food grade, white vinegar or citric acid into
pail.
6. Place the drain hose (H3) and the hose (H2) to the pump (CP) inlet into the cleaning
solution.
7. Open both service valves (V1 and V2) on the hot water and cold water lines.
8. Operate the pump (CP) and allow the cleaning solution to circulate through the
brazed plate heat exchanger for at least 45 minutes.
9. Turn off the pump (CP).
10. Rinse the cleaning solution from the brazed plate heat exchanger as follows:
a. Remove the free end of the drain hose (H3) from the pail
b. Close service valve, (V2), and open shutoff valve, (V4). Do not open shutoff
valve, (V3).
c. Disconnect both H1 and H3 from the service valves
d. Connect H3 to V1 and place the end of the hose in a drain
e. Allow water to flow through the brazed plate heat exchanger for 5 minutes
f. Close service valve, (V1), and open shutoff valve, (V3).
11. Disconnect all hoses.
figure 38
69

Publicité

Chapitres

Table des Matières
loading

Table des Matières