ST Quadrat LUX-top ASP Série Manuel D'utilisation page 25

Masquer les pouces Voir aussi pour LUX-top ASP Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation documentation for
Object Data
Building/Construction project
Street/Zip Code/City
Installation Company
Company
Street/Zip Code/City
Contact person/Phone
Installer
Details for the anchor point and fixing surface
Type/Model/ Overall height
Production year/Serial No.
Rod diameter
Stabdurchmesser
No. on site sketch
Fixing surface/Construction material
Structural member/Element dimensions
Fixation (+declaration of torque)
Date of completion
Roof layout/Site sketch
Confirmations by the installation company
®
The LUX-top
anchor devices have been installed in accordance with the installation
guidelines issued by ST Quadrat.
The fixings used have been installed in accordance with the relevant manufacturer`s guidelines
(proper cleaning of the drillholes, distances from the edges, checking the substrate, etc.)
The layout and instructions for use as well as the technical documentation have been handed
over to the customer and are to be made available to the user.
(City, date)
This documentation must be handed over to the building owner.
A detailed installation documentation with pictures can be generated on the website
ST QUADRAT Fall Protection S.A. – Your competent partner for fall protection – www.lux-top-absturzsicherungen.de
anchor devices
(use additional sheet if necessary)
(Stamp, signature)
page 10
version 10/2014
www.quick-doku.eu

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Lux-top asp ev 9Lux-top asp ev 9 iiLux-top asp ev 9 iii

Table des Matières