Gree GMV-680WM/E-X Manuel D'utilisateur page 53

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

(2) When debugging starts, system will operate according to the ambient temperature.
When outdoor temperature is above 20℃, debugging shall be in cooling mode.
When outdoor temperature is below 20℃, debugging shall be in heating mode.
(3) Before debugging, confirm again whether the cut-off valve of each basic module is fully
turned on.
(4) During debugging, front panel of the outdoor unit must be fully closed; otherwise,
debugging accuracy will be affected (see below).
(5) Before debugging, make sure the needed amount of refrigerant has been added to the
pipe or at least 70% of the needed refrigerant has been added.
(6) Description of each stage of debugging progress:
Debugging
——
code
LED1
progress
Display
Code
status
db
light
db
light
01_Set up
master unit
db
light
db
light
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
Fig. 5.2.1
Fig. 5.2.2
Description of each stage of debugging progress
Progress code
Status code
LED2
LED3
Display
code
Code
status
01
light
A0
01
light
CC
01
light
CF
01
light
OC
50
GMV DC Inverter VRF
Meaning
Display
status
light
System is not debugged.
System doesn't have master unit.
light
Reset master unit.
More than 2 master units are set. Reset
light
master unit.
Master unit is successfully set. Start
light
next progress.

Publicité

Chapitres

Table des Matières
loading

Table des Matières