Initial-set-up process
Set heater switch to ON. The control panel automatically detects what kind of device it is connected to (sauna, Combi, steam
generator). You then follow a six-step start-up sequence. Follow the instructions on the control panel.
1. Welcome screen. Press >
4. Select the date format. Press >
If several Elite panels are connected to the same system, all panels must go through initial setup but certain steps
will be skipped. The parameters to be set are language and date format.
2. Select language. To see all
languages, drag your finger upward
from the bottom of the screen. To
select one, press the desired langu-
age. Press >
5. Enter today's date using the Up
and Down arrows. Press >
3. Select region. Press >
The Region will automatically
define other values such as the
maximum session time and
maximum session temperature.
These can be modified later.
>
6. Set the clock. Press