Report prepared for: Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on 4/30/2018 7:18:14 AM
Test report 103328128MTL-001 (14 of 18)
Stove Builder International Inc.
Project No. G103328128
IV.B. OPERATIONAL DRAWINGS
IV.B.(1).
DILUTION TUNNEL SAMPLE SYSTEMS
IV.B.
IV.B.(1). STACK GAS SAMPLE TRAI
Stove Builder International Inc. | 43615 | Rev: Apr 27 2018 2:35PM | Uncontrolled Copy
OPERATIONAL DRAWINGS
Date: December 27, 2017
Page 14 of 18
Page 167 of 195