Placing Jumper Links - Miller Delta-Fab Manuel Du Propriétaire

Masquer les pouces Voir aussi pour Delta-Fab:
Table des Matières

Publicité

4-14. Placing Jumper Links

230 VOLTS
1
Tools Needed:
3/8 in.
3/8 in.
460 VOLTS
2
Do not overtighten
jumper link nuts.
!
Disconnect and lockout/tag-
out input
power
before
installing or moving jumper
links.
Check input voltage available at
site.
1
Jumper Link Label
Check label − only one is on unit.
2
Jumper Links
Move jumper links to match input
voltage.
Close and secure access door, or
go on to Section 4-15.
575 VOLTS
Ref. S-174 973-B
Ref. 800 103-A
OM-2241 Page 19

Publicité

Table des Matières
loading

Table des Matières