Test report 103328128MTL-001 (5 of 18)
Stove Builder International Inc.
Project No. G103328128
I.D
REPORT ORGANIZATION
This report includes summaries of all data necessary to determine compliance with the
regulations. Raw data, calibration records, intermediate calculations, drawings,
specifications and other supporting information are contained in appendices to this
report.
II.
SUMMARY
II.A
PRETEST INFORMATION
A sample was submitted to Intertek directly from the client. The sample was not
independently selected for testing. The test unit was handed to the Intertek
representative at client's facility in St-Augustin-de-Desmaures, Quebec. The unit was
inspected upon receipt and found to be in good condition. The unit was set up following
the manufacturer's instructions without difficulty.
Following assembly, the unit was placed on the test stand. Prior to beginning the
emissions tests, the manufacturer operated the unit for a minimum of 50 hours at
medium burn rates to break in the stove. The unit was found to be operating satisfactory
during this break-in. The 50 plus hours of pre-burning were conducted from November
th
7
to November 22
Following the pre-burn break-in process the unit was allowed to cool and ash and
residue was removed from the firebox.
dilution tunnels were cleaned using standard wire brush chimney cleaning equipment.
On November 17
Stove Builder International Inc. | 43615 | Rev: Apr 27 2018 2:35PM | Uncontrolled Copy
nd
2017. The fuel used for the break-in process was beech cordwood.
The unit's chimney system and laboratory
th
2017, the unit was set-up for testing.
Date: December 27, 2017
Page 5 of 18