4. INSTALLING THE NEW DAVEY LIFEGUARD
4.1 TOOLS REQUIRED
• Cordless drill;
• 6mm drill bit;
• 7/32" wood drill bit;
• # 2 Phillips head screwdriver;
• Cable ties;
• 5L (or similarly sized) Sulphuric
"pool" acid. Approx 15% strength, or similar;
4.2 INSTALLATION OF THE CHLORINATOR
To operate, the Davey Lifeguard requires first, the installation of an EcoSalt2. If this is yet to
be fitted, please refer to the instructions supplied with the chlorinator. An electronic copy of
the full installation & operating instructions can be downloaded from the following URL:
• EcoSalt2 models– www.bit.ly/EcoSalt2
IMPORTANT: If you are upgrading an already installed chlorinator, it is important to
connect your Lifeguard to WiFi after completing first time set-up so that the chlorinator
can receive a software update (refer Section 7).
4.3 THE ACID DOSING PUMP
4.3.1. Components of the acid dosing pump
H
L
K
J
I
G
A: Clear cover of acid dosing pump;
B: 24VDC power lead;
C: Acid feeder tube;
D: Mounting screw;
E: Wall plug for mounting screw;
F: Double sided tape for assisted wall mounting;
• Chemical handling PPE (see section 4.3);
• Clippers, or knife to cut acid feeder tube;
• Hacksaw;
• Teflon "plumber's" tape;
• PVC primer; and
• PVC glue.
A
M
B
C
F
E
D
6
N
Figure 4.1
▲ CONTENTS