CONTROL PANEL
DISPLAY INDICATIONS
OF
Shut-off phase in progress, duration approx. 10
minutes while the pump continues to work
until the set shut-off temperature is reached
(usually 40°C)
ON AC
Boiler-stove in the fi rst ignition phase: pellet
loading and waiting for the fl ame to light
ON AR
Boiler-stove in the second ignition phase:
heating the boiler body and start-up of com
bustion
Burn
Boiler-stove in water exchange heating phase
P1-P2-P3-P4-P5 Level of power, modulated automatically
50....80°C
Level of water temperature desired for system
output
Pu
Automatic cleaning of chamber in progress
PROG
Timer menu for weekly programming
SET
Menu for setting the clock
SF
Stop Flame: stops functioning for probable
lack of pellets
AF
Ignition Failed: stops functioning for failed
ignition
CP-TS-PA
Control menu available only to Technical As
sistance Centres
H1......H9
System in alarm, the number indicates the
cause of the alarm
When the boiler-stove is in stand-by mode, the display shows the
wording OF and the set temperature.
SCREW FILLING.
The pellet transport duct (screw) has to be fi lled when the boiler-
stove is new (on fi rst ignition) or if the boiler-stove has completely
user all the pellets.
To activate reloading, simultaneously press the keys
display will show the wording "RI".
The reloading function stops automatically after 240" or when the
key
is pressed.
INSTRUCTIONS FOR USE
, the
- 32
ON/OFF key
this also serves to confi rm/exit
Selection key: access to regulation menu
(press for 2 seconds)
Key to DECREASE temperature and to scroll back
from the selected data
Key to INCREASE temperature and to scroll for-
ward from the selected data
This indicates the functioning of the circulator
(pump).
This indicates the functioning of the pellet loading
motor
This indicates that the boiler is functioning within the
parameters of the menu (technical assistance centre
only)
This indicates that the timer is active, and that an
automatic time programme has been chosen
-