Note –
as INPUT_A1 is applied to the Power Sequencers, it is applied to outlet group 9.
FIGURE 1-5
Physical Orientation
Power Sequencer A is the top Power Sequencer in the rack and is connected to Power Strip
A, the outboard strip. Power Sequencer B is the lower one and is connected to Power Strip
B, the inboard one.
Sun Rack Installation Guide • November 2002
1-6
Outlet group 9 in each Power Strip is unswitched and unqualified. That is, as soon
One Power Strip Showing Outlet Groups
9
8
7
6
5
4
3
2
1
0