Setup; Unpacking The Machine - Cassese MACH 4 UNI Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

USER MANUAL

2 SETUP

2.A. UNPACKING THE MACHINE
Cutter
Flat span N.13 & N.17
Allen key N.5
Cut both plastic strips
in order to free the
box and lift up the
wood cover with the
help
of
a
second
person.
After unpacking the
machine, install and
set the 4 feet to level
the machine. Make
sure the 4 feet are
touching
the
floor,
machine
must
be
steady.
One is located under
the screen.
When levelling the machine, if the machine is installed against a working table, make sure a long frame will
not be risen up by the table, because this would cause bad joining. Working table and machine should be
levelled together.
Bubble level
Remove the 4 bolts to
free
the
from the crate. They
are located under the
pallet.
Figure 2-2
The screen is hold in
place with 3 screws.
2 are located on top
of the screen.
Figure 2-3
The screen can be
installed on the other
side of the machine
using these screws.
Figure 2-6
machine
MACH 4 UNI
Figure 2-1
Figure 2-4
Figure 2-5
10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mach 4cart

Table des Matières