Electric pumps for diesel and fuel oil
5
Maintenance and care
Maintenance, inspection and repair work must only be performed by qualified personnel.
Before carrying out any repair or maintenance work, break off the power supply (release terminal
clamps) and relieve pressure lines. De-pressurise the system by opening the dispensing nozzle
after energy separation.
If there is a lack of output from the vane call pump, check the filter screen (see Figure) for
possible contamination.
Safety notices from the documentation of supplier of the assembly units are to be observed.
Ordering spare parts:
When ordering spare parts the following information is required:
Type specification, designation of the ET, order number.
Request the appropriate spare parts list if necessary.
The following maintenance periods should be strictly observed to ensure trouble-free operation.
Entire system including cables,
connecting clamps visual inspection.
Pressure hose
Checking for loose connections
Legibility and availability of
information
MATO machinery and metal goods factory Curt Matthaei GmbH & Co. KG
Benzstr. 16-24 / 63165 Mühlheim am Main / Tel.:+49(0)6108-906-0 Fax:+49(0)6108-906-120
Before
Annually
each use
X
X
X
X
X
Observe manufacturer's
information and the hazard
assessment of the operator.
X
13