READING THESE INSTRUCTIONS IS IMPORTANT FOR PERSONAL SAFETY. READ THE FOLLOWING REMARKS
CAREFULLY BEFORE PROCEEDING WITH THE INSTALLATION. PAY PARTICULAR ATTENTION TO ALL THE PARA-
GRAPHS MARKED WITH THE SYMBOL
IMPORTANT INSTRUCTIONS COULD COMPROMISE THE CORRECT WORKING ORDER OF THE SYSTEM AND
CREATE DANGER SITUATIONS FOR THE USERS OF THE SYSTEM. SAVE THESE INSTRUCTIONS FOR FUTURE USE.
• These instructions are aimed at professionally qualified "INSTALLERS OF ELECTRICAL
EQUIPMENT" and must respect the local standards and regulations in force. All materials
used must be approved and must suit the environment in which the installation is situated.
• All maintenance operations must be carried out by professionally qualified technicians.
• This appliance must be used exclusively for the purpose for which it has been made.
"i.e. for the automation of sliding gates" with a maximum weight of up to 3000 kg.
• The geared motor can be positioned either to the left or to the right of the passageway.
Any non authorised modifications are to be considered improper and therefore dangerous.
Caution! The installation of both anti-derailment buffers is
absolutely obligatory.
IMPORTANT SAFETY INSTRUCTIONS
• This appliance must never be used by people (including children) with physical, sensory
or mental disabilities or by people without specific knowledge and experience in its
operation unless they are able to benefit from the experience or are being taught to use
the appliance whilst being safeguarded by the presence of somebody responsible for
their safety.
• Before installing make sure that the guided parts are in good condition, correctly bal-
anced and that they open and close correctly.
• Avoid becoming trapped between the moving parts and the fixed parts during the open-
ing and closing movements.
• The motor's power cable must be made of polychloroprene in conformity with the inter-
national standard 60245 IEC 57.
It is the responsibility of the installer to make sure that the following public safety conditions
are satisfied:
1) Ensure that the gate operating installation is far enough away from the main road to
eliminate possible traffic disruptions and that the size of the gate, the distance from the
road and the work cycle speed can in no way interfere, causing possible traffic hazards.
2) The motor must be installed on the inside of the property and not on the public side of
the gate. The gates must not open onto a public area.
3) The sliding gate operator is designed for use on gates through which vehicles are pass-
ing. The gates must not be fitted with pedestrian access doors.
4) The minimum controls which may be installed are OPEN-STOP-CLOSE,
these controls must be installed at a height between 1,5 and 1,8 m and
in a location not accessible to children. Controls installed externally must
be protected by a safety device inhibiting unauthorised use.
5) Do not allow children to play with the operator or with the control devices.
6) At least two warning signs (similar to the example on the right) should
be placed, where they can be easily seen by the public, in the area of the system of
automatic operation. One inside the property and one on the public side of the installa-
tion. These signs must be indelible and not hidden by any objects (such as tree branches,
decorative fencing etc.). Make sure that the end-user is aware that children and/or pets
must not be allowed to play within the area of a gate installation. If possible include this
in the warning signs
7) Ahead of the automation a means of disconnection from the power supply must be
installed which has an opening distance on the contacts of all the poles and ensures that
the power supply is completely cut off under the conditions of a category III overvoltage
situation.
8) A correct earth connection is fundamental in order to guarantee the electrical safety of
the machine
9) If you have any questions about the safety of the gate operating system, do not install
the operator. Contact your dealer for assistance.
TECHNICAL DESCRIPTION
- Mains power supply 230 Vac.
- Motor powered with a maximum voltage of 37 Vdc.
- Upper and lower cover in highly resistant shock-proof plastic.
- The reduction unit stator is made of die cast aluminium and contains a never ending
screw and double reduction lubricated with permanently fluid grease.
- Irreversible reduction system with a key-operated manual release mechanism.
- The incorporated electronic programmer contains the power stage, the logic control,
battery charger and the radio receiver decoding module. The power supply is routed to
the electronics card via a separate transformer which is housed in the same container
and is connected to the card by Faston clips.
- The system is fitted with electronic deceleration control which reduces the stress caused
by the gate inertia when it stops.
Accessories
106/CRENY
Rack (20 mm x 30 mm) in glass fibre with upper fastening slits (1 m).
106/CRENY1 Rack (20 mm x 30 mm) in glass fibre with lower fastening slits (1 m).
106/SLOAC
Rack in galvanised steel (22 mm x 22 mm) 2 m to be welded.
106/SLOAC2 Rack in galvanised steel (12 mm x 30 mm) 1 m with fastening slits.
950/NC8K2L Contact safety edge. Lengths 1,6 to 3,0 m - max height 61 mm.
ATTENTION! IMPORTANT SAFETY INSTRUCTIONS
IN THIS ORIGINAL INSTRUCTION MANUAL. NOT READING THESE
WARNING
AUTOMATIC OPENING
KEEP CLEAR
CHILDREN OR PETS MUST NOT
BE ALLOWED TO PLAY ON OR
NEAR THE INSTALLATION
USER INSTRUCTIONS
Attention! Only for EU customers - WEEE marking.
This symbol indicates that once the products life-span has expired it must be
disposed of separately from other rubbish. The user is therefore obliged to either
take the product to a suitable differential collection site for electronic and electrical
goods or to send it back to the manufacturer if the intention is to replace it with a
new equivalent version of the same product.
Suitable differential collection, environmental friendly treatment and disposal contributes to
avoiding negative effects on the ambient and consequently health as well as favouring the
recycling of materials. Illicitly disposing of this product by the owner is punishable by law
and will be dealt with according to the laws and standards of the individual member nation.
Q
During the opening/closing manoeuvre check for correct operation and activate the emer-
gency stop button in case of danger.
Warning! Entrapment danger. When using the device you are advised to wait for the
gate to copmpletly open before crossing its threshold and to pay the maximum attention in
order to avoid becoming trapped between the hinged parts and the fixed parts during the
opening and closing movements.
During blackouts with a flat battery the gate can be released and manually manoeuvred
using the supplied release key (see manual release fig. 8).
Periodic maintenance
Before carrying out any cleaning or maintenance operations make sure the power is dis-
connected at the mains, the motor power cables are disconnected and the batteries have
been disconnected.
Periodically check the moving parts for wear and tear and grease if required, using lubri-
cants which maintain their friction levels unaltered throughout time and are suitable for
temperatures of -20 to +70°C.
Eventual repair work must be carried out by specialised personnel using original spare parts.
The appliance is not suitable for continuous operation and may only be operated using a
duty cycle of 70%.
PRELIMINARY CHECKS (fig. 1, pag. 2)
Before starting the installation make sure that the structure which is to be automated is in
good working order and respects the local standards and regulations in force.
To this end ensure that:
- The surface of the sliding gate "A" is smooth and has no protrusions up to a distance of
2.5 m from ground level. Protrusions on the gate surface which are not greater than 3 mm
and have rounded edges are acceptable.
If the surface of the gate is not smooth, the entire height up to 2.5 m from the ground must
be protected by two of the following devices:
a) photoelectric cells
b) contact safety buffer
- the distance "B" between the fixed parts and sliding parts of the installation must not exceed
15 mm.
- the runner guide "C", preferably round, should be securely fixed to the ground, completely
exposed and free of any imperfections which could inhibit the correct movement of the gate.
- when the gate is closed a space of 50 mm "D" must remain for the entire height of the front
part of the gate and a mechanical travel limit "E" must be positioned on the upper part of
the gate.
- The free space "D" can be covered with a rubber anti-crush buffer "F" or better still a
pneumatic or photoelectric contact safety buffer.
- if the gate slides past a fixed structure "G" which has railings or bars leaving open spaces,
it must be protected in one of the following ways:
1. distance "H" greater than 500 mm: no protection required;
2. distance "H" between 500 and 300 mm: wire mesh fencing "I" or punched metal plating
"L" with an opening which does not allow the passage of a 25 mm diameter sphere "M"
must be fitted;
3. distance "H" smaller than 300 mm: wire mesh fencing "I" or punched metal plating "L"
with an opening which does not allow the passage of a 12 mm diameter sphere "M" must
be fitted.
The wires of the mesh "I" must not have a cross-section of less than 2.5 mm
punched metal plating "L" must not have a thickness of less than 1.2 mm. Protection is
not necessary for the area "P" if the fixed structure with railings or bars is over 2.5 m above
the ground.
- check the gate components, replace any worn or damaged parts and then lubricate them.
- using a spirit level "N" check that the castor guide is in square.
- the upper runner guide "O" must have the correct play for the gate and must not inhibit the
gate's sliding action.
- check that a mechanical travel limit "Q" (absolutely necessary) has been fitted in the open-
ing direction and that it corresponds to the maximum travel distance "P" of the gate. The
travel limit must guarantee anti-derailment and gate stability.
Warning! It is the installer's responsibility to check all critical danger points, to take
action and to install any devices needed to guarantee the safety of all people using
the gate (risk analysis).
14
2
and the