Horizontal Installation; Vertical Installation - Napoleon Fireplaces LHD62N Instructions D'installation Et D'opération

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.1.1 HORIZONTAL INSTALLATION

THE FIRESTOP ASSEMBLY MUST BE INSTALLED WITH THE VENT SHIELD TO THE TOP.
TERMINALS MUST NOT BE RECESSED INTO A WALL OR SIDING MORE THAN THE DEPTH OF THE
This application occurs when venting through an exterior wall.
Having determined the correct height for the air terminal
location, cut and frame a hole in the exterior wall as
illustrated to accommodate the fi restop assembly.
Dry fi t the fi restop assembly before proceeding to
ensure the brackets on the rear surface fi t to the
inside surface of the horizontal framing.
The vent shield is telescopic and must be adjusted
to shield the full depth of the combustible wall
penetration. The length of the vent shield may be cut
shorter for combustible walls that are less than 6" (152mm)
thick.
A. Apply a bead of caulking (not supplied) around the corner edge of
the inside surface of the fi restop assembly, fi t the fi restop
assembly to the hole and secure using the 4 screws (supplied in
your manual baggie).
B. Once the vent pipe is installed in its fi nal position, apply high temperature sealant W573-0007 (not
supplied) between the pipe and the fi restop.

4.1.2 VERTICAL INSTALLATION

This application occurs when venting through a roof. Installation kits for
various roof pitches are available from your authorized dealer / distributor. See
accessories to order specifi c kits required.
A. Determine the air terminal location, cut and frame a square opening as
illustrated in the ceiling and the roof to provide the minimum 1" (25mm)
clearance between the vent pipe and any combustible material. Try to center
the vent pipe location midway between two joists to prevent having to cut
them. Use a plumb bob to line up the center of the openings. A vent pipe
shield will prevent any materials such as insulation, from fi lling up the 1"
(25mm) air space around the pipe. Nail headers between the joist for
extra support.
B. Apply a bead of caulking (not supplied) to the framework or to the Wolf
Steel vent pipe shield plate or equivalent (in the case of a fi nished ceiling),
and secure over the opening in the ceiling. A fi restop must be placed on the
bottom of each framed opening in a roof or ceiling that the venting system passes
through. Apply a bead of caulking all around and place a fi restop spacer over
the vent shield to restrict cold air from being drawn into the room or around the
fi replace. Ensure that both spacer and shield maintain the required clearance to
combustibles. Once the vent pipe is installed in its fi nal position, apply sealant between the
pipe and the fi restop assembly.
C. In the attic, slide the vent pipe collar down to cover up the open end of the shield and
tighten. This will prevent any materials, such as insulation, from fi lling up the 1" (25mm) air
space around the pipe.
WARNING
!
RETURN FLANGE OF THE MOUNTING PLATE.
CAULKING
FIRESTOP
VENT
SHIELD
SPACER
FINISHING
MATERIAL
19
DETERMINE
THE
CORRECT
HEIGHT
FIRESTOP
UNDERSIDE OF
JOIST
CAULKING
VENT PIPE
SHIELD
VENT
PIPE
COLLAR
VENT
PIPE
SHIELD
21.1
W415-1334 / 06.10.14
EN

Publicité

Chapitres

Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

Lhd62p

Table des Matières