ENGLISH
MAINTENANCE
The lifespan of the machine and its maximum operating safety are ensured by correct and regular maintenance. The following chart
provides the scheduled maintenance. The intervals shown may vary according to particular working conditions, which are to be
deined by the person in charge of the maintenance.
WARNING!
Maintenance procedures must be performed with the machine switched off and the batteries/battery charger
cable disconnected.
Moreover, carefully read the instructions in the Safety chapter.
All scheduled or extraordinary maintenance procedures must be performed by qualiied personnel, or by an authorised Service
Center. This Manual describes only the easier and most common maintenance procedures.
NOTE
For other maintenance procedures shown in the Scheduled Maintenance Table, refer to the Service Manual that can be
consulted at any Service Center.
SCHEDULED MAINTENANCE TABLE
Procedure
Squeegee cleaning
Brush cleaning
Tank and vacuum grid cleaning
Squeegee blade check and replacement
Solution ilter cleaning
Battery charging
WET battery luid level check
Screw and nut tightening check
Brush motor carbon brush check and replacement
Vacuum system motor carbon brush check and replacement
(1) And after the irst 8 working hours.
(2) This maintenance procedure must be performed by an authorised Clarke Service Center.
18
INSTRUCTIONS FOR USE
VANTAGE 17 B - 9099650000
Daily, after
using the
Weekly
machine
Every six
Yearly
months
(1)
(2)
(2)