Start The System - Daikin EKHHP300A2V3 Manuel D'installation Et D'utilisation

Masquer les pouces Voir aussi pour EKHHP300A2V3:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3
x
Start-up

3.1.2 Start the system

● Check all the points on the enclosed checklist.
Document the test result.
● Switch on the power supply at the distributor
box of the house installation for the DAIKIN Hot
water heat pump.
● Switching DAIKIN EKHHP on.
1.
DAIKIN EKHHP system set up in accordance with a permitted installation variant and
no damage detected?
2.
Minimum distance between the DAIKIN EKHHP and other sources of heat (>80°C) of
1 m?
3.
Booster Heater:
– Does the mains connection comply with the regulations and is the mains voltage
230 volts at 50 Hz?
– Has the residual current device been fitted in accordance with the individual coun-
try-specific regulations?
4.
Is the heat exchanger for domestic hot water heating in the DAIKIN EKHHP full and
has it been bled?
5.
Is the storage tank full with water to the overflow point?
6.
Is the safety overflow connection connected to an open drain?
7.
Is the water pressure on the sanitary side < 6 bar?
8.
Are all hydraulic connections tight (leaks)?
9.
Have the parameters been set on the controller in accordance with the structural con-
ditions, possibly connected accessories and the user stipulations?
10. Is the parameter [7-02] set to the value 0?
11. Does the installation operate without faults?
12. Has the operating manual been handed over, and has the owner been instructed?
Location and Date:
Installation and maintenance manual
16
● Perform a test run:
– Allow the temperatures to be displayed
(see section 5.2.3).
– Test the hot water generation function.
Select a higher set hot water temperature so
that the heating function is activated (see
section 5.3.1).
● Sign the check list, together with the operator.
Only if it is possible to answer all items on the
check list by Yes, is it allowed to commission and
hand over the DAIKIN Hot water heat pump to the
operator.
Check list for start-up
Signature of installer:
Signature of operator:
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
DAIKIN EKHHP(3/5)00AA2V3
DAIKIN Hot water heat pump
008.1423444_02 – 09/2015

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ekhhp500a2v3

Table des Matières