Operations And Troubleshooting; Charging - Bosch EL-51245-Serie Instructions D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6

Operations and Troubleshooting

6.1

Charging

See Figure 6-1. Turn the Bosch Level 2 Charging Station power switch to ON. Wait 3 seconds for the green
1.
indicator light.
Figure 6-1. Powering on the Bosch Level 2 Charging Station and removing the charging plug
2.
See Figure 6-2. Release the charging plug from the plug dock and connect it to the EV to start the charging
process.
Installation and Operating Instructions | Bosch Level 2 Charging Station | 13 | en
Figure 6-2. Connecting the charging plug to the EV
569217 | REV. D | 09.08.2016

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

El-51253-serieEl-51254-serie

Table des Matières