Télécharger Imprimer la page

Victron energy BlueSolar MPPT 150/35 Mode D'emploi page 10

Masquer les pouces Voir aussi pour BlueSolar MPPT 150/35:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 25
3.7 Battery charging information
The charge controller starts a new charge cycle every moring,
when the sun starts shining.
The maximum duration of the absorption period is determined by
the battery voltage measured just before the solar charger starts
up in the morning:
Battery voltage Vb (@start-up)
Vb < 23,8V
23,8V < Vb < 24,4V
24,4V < Vb < 25,2V
Vb > 25,2V
(divide voltages by 2 for a 12 V system and multiply by two in
case of a 48V system)
If the absorption period is interrupted due to a cloud or due to a
power hungry load, the absorption process will resume when
absorption voltage is reached again later on the day, until the
absorption period has been completed.
The absorption period also ends when the output current of the
solar charger drops to less than 2 Amps, not because of low solar
array output but because the battery is fully charged (tail current
cut off).
This algorithm prevents over charge of the battery due to daily
absorption charging when the system operates without load or
with a small load.
3.8 Connectivity
Several parameters can be customized (VE.Direct to USB cable,
ASS030530000, and a computer needed). See the data
communication white paper on our website.
The required software can be downloaded from
http://www.victronenergy.nl/support-and-downloads/software/
The charge controller can be connected the to a Color Control
panel, BPP000300100R, with a VE.Direct to VE.Direct cable.
8
Maximum absorption time
4 h
2 h
1 h
0 h

Publicité

loading