Angelo Po 1G1FA0GV Manuel D'utilisation Et D'installation page 46

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

LEVELLING
Adjust the floor-mounted feet (A) to level the appli-
ance.
ASSEMBLY APPLIANCES IN BANKS
To assemble appliances in banks (side by side)
proceed as described below.
1 - Pull off the knob (A).
2 - Undo the screws (C) and remove the control
panels (B).
3 - Apply masking tape to the edges to be
placed side by side.
4 - Apply food-approved sealant to the edges
to be placed side by side.
5 - Place the appliances side by side.
6 - Connect the appliance using the screws and
nuts (D-E).
7 - Remove the excess sealant and the masking
tape.
IT
8 - Apply the sealant to the inside of the lid (F), and
fit it to cover the fixing zone.
GB
9 - Replace the control panels (B) and the knobs
(A) on completion of the operation.
DE
FR
A variety of optional installation kits are available for
arranging appliances in banks:
ES
G)"Bridge" installation kit
English
C
A
B
D
D
E
- 18 -
A
IDM-39603610000.tif
F
E
IDM-39618301100.tif
G
IDM-39609202500.tif

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

2g1fa0gv2g1fadgv

Table des Matières