About This Product; Safety; Storage And Transport - ProMinent Flow Control 3 - DN10 Mode D'emploi

Contrôle du dosage
Masquer les pouces Voir aussi pour Flow Control 3 - DN10:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1
"Flow Control" flow monitors, sizes 3 to 5, are suitable for metering pumps
in the Sigma/ 1, Sigma/ 2 and Sigma/ 3 or size 3 for metering pumps of the
delta
directly onto the pump head if liquid ends have an integrated pressure relief
valve. The flow monitor is supplied ready fitted with a connection cable.
It is used for monitoring the flow volume pulses of the dosing pump in
accordance with the float and orifice principle. The partial flow of liquid
media flowing past the float is adjusted using the control lever to the lift
volume set at the pump such that an alarm is given if the flow drops below
the set feed rate.
The user can set the permitted number of incomplete strokes/min at the
pump between 1-127 for precise adaptation to the process requirements.
2
• The Flow Control is exclusively designed to feed the pulse of the flow
• The Flow Control can be screwed directly (without adapter) onto liquid
• The Flow Control may be used only in conjunction with a pressure relief
• All other uses or modifications are prohibited!
• The Flow Control cannot indicate a burst in the pump discharge line.
• The Flow Control must be operated by trained personnel.
• Observe the relevant national directives throughout the service life phases
• You must observe the information in the operating instructions manual on
3
Admissible storage temperature:
Humidity:
®
ProMinent
About this product / Safety / Storage and transport

About this product

®
product range series with plastic liquid ends. They can be fitted

Safety

volume of the liquid chemical being pumped by a Sigma/ 1, Sigma/ 2 or
Sigma/ 3 or delta
®
series back to the pump. If there is no acknowledge-
ment pulse the Flow Control thereby indicates that no medium is being
metered (due to blocked pump priming or discharge line, empty chemical
feed tank, air in the liquid end, ...).
ends only made of plastic.
valve!
All other activities must be carried out by appropriately trained and
authorised personnel!
of the equipment!
the different service life phases of the equipment!

Storage and transport

-10 ºC to +50 ºC
98 % rel. humidity, non condensing
17

Publicité

Table des Matières

Dépannage

loading

Table des Matières