Electrical installation
CTC EcoAir
Electrical installation is to be carried out by an authorized
electrician and in accordance with current regulations.
The condensation tray is supplied with a connection cable which
can be used to permanently connect the tray to the control box
in CTC EcoAir (230 VAC, Phase, Neutral and Earth). The prod-
uct's outlet connection has a cable lead-through so that a heating
coil, such as a self regulating heating cable, can be fitted to the
outlet.
Installation of condensation tray in EcoAir's control box
Terminal block kit comprising the following:
1. PE – terminal block (earth terminal block)
2. N – neutral terminal block
3. Plug-in bridge
4. L1 – terminal block, incl. fuse
4
1
2
3
Picture 5
Cable led-through for
additional heating cable
Condensation
outlet
15