Télécharger Imprimer la page

CTC EcoAir 10 Mode D'emploi page 15

Publicité

Les langues disponibles

Les langues disponibles

Electrical installation
CTC EcoAir
Electrical installation is to be carried out by an authorized
electrician and in accordance with current regulations.
The condensation tray is supplied with a connection cable which
can be used to permanently connect the tray to the control box
in CTC EcoAir (230 VAC, Phase, Neutral and Earth). The prod-
uct's outlet connection has a cable lead-through so that a heating
coil, such as a self regulating heating cable, can be fitted to the
outlet.
Installation of condensation tray in EcoAir's control box
Terminal block kit comprising the following:
1. PE – terminal block (earth terminal block)
2. N – neutral terminal block
3. Plug-in bridge
4. L1 – terminal block, incl. fuse
4
1
2
3
Picture 5
Cable led-through for
additional heating cable
Condensation
outlet
15

Publicité

loading