Mounting On The Wall; Connecting Of The Condensation Drain - Zehnder ComfoFond-L Eco 350 L Manuel De L'installateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 30

4.2 Mounting on the wall

Mount the ComfoFond-L Eco against a wall with a
minimum mass of 200 kg/m
frame (available as an optional extra) must be used
for other walls. This reduces contact noise as much
as possible.
Make sure to leave a minimum space of 110 cm in
front of the ComfoFond-L Eco in view of the
necessary maintenance work.
Where necessary, reposition the ComfoAir Luxe
documentation to make sure it is still accessible
following the installation of the ComfoFond-L
Eco.
ComfoFond-L Eco 350
1. Align the wall mounting bracket supplied with
the unit to the wall, ensuring it is level. The
suspension bracket should be fitted at the
same height as that of the ventilation unit (see
appendix: Wall-mounting pictures).
2. Place the ComfoFond-L Eco in the wall mounting
bracket.
3. Rotate outdoor connecter bend (A) of the
ventilation unit and connect it to the supply air of
the ComfoFond-L Eco.
C
A. Outdoor air connector bend
C. Exhaust liquid connector
4. Fit the condensation drain to the underside of the
ComfoFond-L Eco, as described in the chapter
on mounting the condensation drain.
5. Fit the fluid circuit (geothermal collector),
including the boiler safety group, to the exhaust
side (C) of the ComfoFond-L Eco, as described in
the chapter on mounting the fluid circuit.
6. Connect the 2 pipes of the ComfoFond-L Eco to
the ventilation unit, as described in the chapter
on mounting the electrical connections.
EN - 20
. The Zehnder support
2
A
ComfoFond-L Eco 550
1 Align the wall mounting bracket supplied with
the unit to the wall, ensuring it is level. The
suspension bracket should be fitted at the
same height as that of the ventilation unit (see
appendix: Wall-mounting pictures).
2. Place the ComfoFond-L Eco in the wall mounting
bracket.
3. Place the metal sleeve joint (A) on the niche pipe
(outside air) of the ventilation unit.
4. Use the EPP sleeve joint to connect both 90º
connection bends (B).
5. Place the connected 90º connection bends on
the metal sleeve joint (A) of the ventilation unit
and the air exhaust of the ComfoFond-L Eco.
A
A. Metal sleeve joint
B. EPP sleeve joint
C. Exhaust liquid connector
6. Fit the condensation drain to the underside of the
ComfoFond-L Eco, as described in the chapter
on mounting the condensation drain.
7. Fit the fluid circuit (geothermal collector),
including the boiler safety group, to the exhaust
side (C) of the ComfoFond-L Eco, as described in
the chapter on mounting the fluid circuit.
8. Connect the 2 pipes of the ComfoFond-L Eco to
the ventilation unit, as described in the chapter
on mounting the electrical connections.
4.3 Connecting the condensation drain
Take account of the following factors (see also
Appendix: Condensation drain pictures)
when fitting the condensation drain:
The condensation must be drained off frost-free,
at a gradient, using an appropriate siphon;
Connect the condensation drain (air-tight) via a
pipe or a hose with a siphon (with a water seal of
at least 60mm) to the sanitary pipework;
Position the upper edge of the siphon at least 60
mm underneath the condensation drain of the
ComfoFond-L Eco.
The condensation drains of the ComfoFond-L
Eco and the ventilation unit must always be
connected with a siphon.
B
C

Publicité

Table des Matières
loading

Table des Matières