THREE-PHASE OPERATORS (SK130E, SK135E, SK130C and SK135C) with VIVO-I103 board
SK130-SK135
Operator parts (SK130, SK135):
D:
Unlock switch
K:
Thermal cut-out
FCA:
Opening limit switch
FCC:
Closing limit switch
FCS:
Additional limit switch (to be used in
accordance with customer or installation
requirements)
Control board parts (VIVO-I103):
DS1:
LED SNG1 (FCA)
DS4:
LED SNG2 (FCC)
SW1:
General circuit breaker
22
Installation Guide
U:
red
V:
blue
W: white
VIVO-I103
G1
G2
G3
Change the SK130 and SK135 settings,
s w i t c h i n g f r o m 3 x 4 0 0 V t o 3 x 2 3 0 V ,
connecting the cables as follows:
U:
red + brown
V:
blue + green
W: white + black
DS1
DS4
Select
options
operation) and C702 (limit switches).
Operator connections SK130, SK135:
1
Opening limit switch (FCA)
2
Limit switches common
3
Closing limit switch (FCC)
4-5 Additional limit switch (FCS)
6-7 Thermal cut-out / unlock switch
U, V, W: Motor connections
PE: Earth connection
Check turning direction using UP and DOWN in
parameter C101. If it is not correct, select C102
(see the control board instructions for further
information).
VIVO-I103:
C303
(up-and-over
P93U

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sky sk110cSky sk130eSky sk130cSky sk135eSky sk135cSky

Table des Matières