Installation; Tools And Materials; Initial Conditions And Checks - Erreka SKY SK110E Manuel De L'installateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29

INSTALLATION

1

TOOLS AND MATERIALS

Electrician's screwdriver and Phillips screwdriver 2x125
Spanner 13mm
Allen key 5mm
Marker pencil
Tape measure
2

INITIAL CONDITIONS AND CHECKS

Initial conditions of the door
Check that the size of the door is within the
admissible range of the operator (see the
technical features of the operator).
If the door to be automated has a personnel
door, use a safety device to prevent the
operator from operating with the personnel
door open.
Environmental conditions
This device is not suitable for installation in
inflammable or explosive environments.
Electrical power supply installation
The electrical connections shall be made in line
with the instructions in the control board
manual.
The electrical cable section is indicated in: "Fig. 1
Elements of the complete installation" on page 15.
Electrical drill and broaches
Use the electrical drill in line with the user
manual.
Wall or structure support attachment screws
The door must be easy to manipulate manually,
namely:
• It must be balanced, in order to ensure the effort
made by the motor is minimum.
• There should be no stiffness throughout its open/
close.
Do not install the operator in a door which
does not work correctly in manual operation,
as this may lead to accidents. Repair the door
before installing.
Check that the admissible environmental
temperature range for the operator is suitable
for the location.
English
SKY electromechanical operator
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sky sk110cSky sk130eSky sk130cSky sk135eSky sk135cSky

Table des Matières