Installation Requirements; Tools And Parts - Haier HCH2100ACS Guide De L'utilisateur

Masquer les pouces Voir aussi pour HCH2100ACS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION REQUIREMENTS

TOOLS AND PARTS

Gather the required tools and parts before starting installation. Read and follow the
instructions provided with any tools listed here.
Tools needed
Level
Drill with 1¼", ¹⁄₈", and ⁵⁄₁₆" drill bits
Pencil
Wire stripper or utility knife
Tape measure or ruler
Pliers
For non-vented (recirculating) installations, you will also need:
6" (15.2 cm) dia. round metal vent duct - length required is determined by ceiling
height.
Parts supplied
Remove parts from packages. Check that all parts are included.
120 V power cord with 3 prong plug
Hood canopy assembly with blower,
vent transition, light bulb and
canopy glass already installed
Metal grease filter
Vent cover support bracket
Mounting template
Caulking gun and weatherproof
caulking compound
Vent clamps
Jigsaw or keyhole saw
Flat-blade screwdriver
Metal snips
Phillips screwdriver
Metric hex key set
2-piece vent cover
4 - 4 x 8 screws
6 - 5 x 45 mm mounting screws
2 - 8 x 40 mm wall anchors
4 - 10 x 50 mm wall anchors
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hch3100acsHch6100acs

Table des Matières