Installation Preparation; Preparing Hood Location - Haier 3000 Série Guide De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

installation Preparation

To install this range hood, you will need the following tools and materials:
note: this procedure will require 2 people for easier installation.
tools needed for installation
• Drill
• 1/8" Drill bit for drilling pilot holes
• 1-1/4" Wood bit for drilling electrical wiring access hole
• Phillips head screwdriver
• Flat-head screwdriver
• Pliers
• Pencil, ruler and level for marking range hood location
• Hand saw or jig saw for cutting the wall or cabinet openings
• Hi-Temp duct tape
• Electrical tape
• Connector Clamp

Preparing Hood Location

1. Determine whether hood will discharge vertically (3¼" x 10" or 7" Round),
horizontally (3¼" x 10" only) or non-ducted. For vertical or horizontal discharge,
run ductwork between the hood location and a roof cap or wall cap. For best
results, use a minimum number of transitions and elbows.
2. Use diagram, below, for proper placement of ductwork and electrical cutout in
cabinet or wall. For a non-ducted installation, DO NOT cut a duct access hole.
3. Run house wiring between service panel and hood location.
English
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

4000 série

Table des Matières