Training
Use of the unit requires adequate lesson by a professional or the use of the manual only. Special training is not required.
Technical data
Voltage:
Frequency / protection type
Protection class:
Maximum capacity :
Motor speed :
Adjustment angle:
Grinding disc (mm):
Connection cable:
Worktable surface area LxW (mm)
Weight ca:
Level of acoustic performance
Level of sound pressure
Article-No.:
Safety Instructions for the First Putting in Operation
Always make sure that the unit is safely attached to suitable surface
Procedure
Assemble separate parts in the correct order as shown. Make sure that structural parts are arranged as shown in figures.
Assembly and First Putting in Operation
Structural Group 1
Fig. 2
Structural Group 2
Fig. 3
230 V
50 Hz / IP 20
II
85 W
-1
4800 min
35° links/rechts
108 x 23 x 3,2
1,5 m / H05 VV-F
200 x 270
2,2 kg
L
93 dB
WA
L
80 dB
PA
94077
Required structural groups
Structural group 1
15
Delivery-contained parts and
accessories
Fig. 1 – Pos. 1
Fig. 1 – Pos. 2
Delivered parts and
accessories
Screw the unit on a suitable
surface!
Fixing screw not
included!