Télécharger Imprimer la page

Baxi POWER HTE Série Manuel D'installation page 14

Kit d'aspiration

Publicité

EN
L1
L2
Connection through the roof
L1
L2
ES
L1
L2
Conexión paso de tetcho
L1
L2
Flexible connection
> 50 cm²
L3
WAS
L4
> 50 cm²
> 50 cm²
L3
WAS
L4
> 50 cm²
Conexión flexible
> 50 cm²
L3
WAS
L4
> 50 cm²
> 50 cm²
L3
WAS
L4
> 50 cm²
L1
L2
The long pieces (L1, L2, L3 and L4) are made with the
COX Geelen BV ducts covered by CE marking and the
DTA technical application directive.
Models
Ø conduit/duct
L1-L2- L3 (mm) Ø duct
(L1+L2) (m) stiff
(L1+L2) (m) flexe
L3 < 5 m + 2 elbow s and L4 < 5 m + 1 elbow
WAS Connect set
L1
L2
Las longitudes (L1, L2, L3 y L4) deben realizarse con
conductos marcado CE y acordes a la Directiva técnica de
apicación DTA.
Modelos
L4 (mm) Ø conducto
L1-L2- L3 (mm) Ø conducto 110 110 110 125 110 125 160 125 160
(L1+L2) (m) rígida
(L1+L2) (m) flexible
L3 < 5 m + 2 acodados y L4 < 5 m + 1 codo
WAS Set de conexión
14
Stiff connection
> 50 cm²
L3
WAS
L4
> 50 cm²
45
85
65
100
80 110 110 110 110 110 110 110 110
110 110 110 125 110 125 160 125 160
56
56 56
56 56 27 56
88 54 88
13
WAS 110
Conexión rígida
> 50 cm²
L3
WAS
L4
> 50 cm²
45
85
65
100
80 110 110 110 110 110 110 110 110
56
56 56
56 56 27 56
88 54 88
13
WAS 110
120
150
WAS 160
120
150
WAS 160

Publicité

loading