STANDARD POWER CONNECTION

Connect the 2 electrical wires to the 2-point
terminal block, as shown below:
Observe the polarity of the wires to avoid
damaging the terminal.
The guarantee does not cover any dam-
age resulting from improper use.
Check that the connectors on the power
cable are compatible with your electrical
system.
Follow the steps below to connect the termi-
nal to the network and power supply in the
standard power supply configuration.
Thread the cable through the grommet.
Do not use damaged power cords or
plugs.
Do not twist or damage the power cable.
Prepare the wires in the cable and screw
them onto the 2-point terminal block, ob-
serving the polarities shown above.
Install the 2-point terminal block in the
matching baseplate. Tighten the two hold-
ing screws fitted to the ends of the termi-
nal block.
The terminal must be supplied with a
voltage of between 12 and 24 VDC.

PoE CONNECTION

Follow the steps below to connect the termi-
nal to the network and power supply in the
PoE power supply configuration.
Thread the cable through the grommet.
Prepare the wires of the cable and screw
them into the 9-point terminal block, ob-
serving the color codes shown below.
Plug the end of the cable into your PoE
injector's Power+Data ("PD") port. Install
the 9-point terminal block in the matching
baseplate. Tighten the two holding screws
fitted to the ends of the terminal block.