STANDARD POWER CONNECTION
Connect the 2 electrical wires to the 2-point
terminal block, as shown below:
Observe the polarity of the wires to avoid
damaging the terminal.
The guarantee does not cover any dam-
age resulting from improper use.
Check that the connectors on the power
cable are compatible with your electrical
system.
Follow the steps below to connect the termi-
nal to the network and power supply in the
standard power supply configuration.
➊
Thread the cable through the grommet.
Do not use damaged power cords or
plugs.
Do not twist or damage the power cable.
➋
Prepare the wires in the cable and screw
them onto the 2-point terminal block, ob-
serving the polarities shown above.
➌
Install the 2-point terminal block in the
matching baseplate. Tighten the two hold-
ing screws fitted to the ends of the termi-
nal block.
The terminal must be supplied with a
voltage of between 12 and 24 VDC.
PoE CONNECTION
Follow the steps below to connect the termi-
nal to the network and power supply in the
PoE power supply configuration.
➊
Thread the cable through the grommet.
➋
Prepare the wires of the cable and screw
them into the 9-point terminal block, ob-
serving the color codes shown below.
➌
Plug the end of the cable into your PoE
injector's Power+Data ("PD") port. Install
the 9-point terminal block in the matching
baseplate. Tighten the two holding screws
fitted to the ends of the terminal block.
EN
9