Toto EcoPower TET1GAR Manuel D'installation Et D'utilisation page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION PROCEDURE
9. Fasten the sensor top cover to body
assembly with the supplied screws
and hex wrench.
Protect the wire connections
inside the top cover.
10. Before the supply water is turned on,
be sure all water leaks are eliminated
by tightening all the pipe connections.
NOTE: If for any reason it becomes necessary
to remove the control stop, make sure
the water is shut off at the main supply
valve.
The Flush Valves are preset for fixture volume as marked on
the valve carton. The valve does not require adjustment for
variation in water pressure within its operating range.
11. To set the Flush Valve for proper operation, open the
control stop completely by using the adjusting screw.
12. Activate the Flush Valve several times.
13. In the case of excessive flow rate, gradually adjust the
control stop towards the closed position using the
adjusting screw, until there is suitable water flow into the
fixture.
14. The cap for the control stop should be placed after final
adjustments have been made.
15. Tighten the cap firmly with a wrench.
WARNING: Do not open the control stop to the point where the flow from the Flush Valve exceeds
the flow capability of the fixture. In case of a valve failure, the water must not overflow
from the fixture.
Hex wrench
Pipe connection
9
Pipe connection
Pipe connection
Escutcheon
Joint tube
Control stop
Cap

Publicité

Table des Matières
loading

Table des Matières