Wire rope winch >LAMBDA< BGV C1 for stages and studios
English
Mechanical Fixing:
screws
material grade
Number of screws
Tightening torque [Nm]
Mounting positions
Various rope paths can be applied subject to the
mounting positions as shown.
Pay attention to rope in-take and out-take.
Wire rope fixing
Insert the rope in consideration of
winding direction.
Tighten the clamping screws
Tightening torque for clamping screws
rope ø
clamping screws
Tightening torque
Operating Instructions
Safety Instruction: The winch is only suited for manual operation.
lowering
rope direction
Vario-Crank
The winch is equipped with a Vario-crank and a detachable crank arm. The crank arm is adjustable.
Suitable when using the winch in confined areas.
The crank arm with handle may be detached from the winch.
Detaching the crank arm: (pay attention to freedom of motion)
loosen the adjusting screw
Pull the crank arm via the safety ball out of the guiding (expenditure of force is required)
store the crank arm
slightly tighten the adjusting screw
Fixing the crank arm: (pay attention to freedom of motion)
loosen the adjusting screw
put the crank arm into the guiding, strongly push over safety ball
push the crank arm into the required position
re-tighten adjusting screw
When pulling or pushing the crank arm make sure that there is enough free space.
Pulling or pushing with force may cause accidents.
Adjustment
loosen the adjusting screw
bring the crank arm into the required position
re-tighten adjusting screw
Before every use check firm seat of the crank arm
technische Änderungen vorbehalten
M 12
min. 8.8
4
70
17,5 Nm
Lifting the load by
turning the crank
clockwise.
Lowering the load by
turning the crank
lifting
counter-clockwise.
design changes under reserve
rope direction
For rope selection pay attention to the technical data for
the rope.
The wire rope must have a 10-fold safety against breaking
related to the lifting capacity.
The diameter of rope rollers have to be at least 20-fold, the
6
rope drum diameter at least 18-fold, the rope diameter.
M 8x16
Calculate the rope length in such a way that at least 3 full
turns of rope remain on the drum in lowest load position.
Lifting
Rope direction
changements techniques sous réserve
04.04.014
Wire rope direction
Rope direction
Lifting the load by
turning the crank
counter-clockwise.
Lowering the load by
Lowering
turning the crank
clockwise.
3
2
1
9 / 9