Attachment / Before Starting The Equipment; Important; Initial Operation - Scheppach HL660 Traduction Des Instructions D'origine

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29
9. Attachment / Before starting the
equipment
At least two people are required to install the de-
vice.
9.1 Installing the base frame (fig. 3 + 4)
For technical reasons of packaging, the stand must
be fitted by the customer.
Use the attached hexagon bolts M6 x 16 with nut
1. Remove the hub cap and disassemble the wheels.
2. Connect all single parts of the stand with the ma-
chine.
3. Place the device horizontally on the floor, and put
the Styropor pad of the packaging underneath the
splitting wedge side.
4. Assemble the wheels on the wheel axis of the
stand.
9.2 Installing the handle (4)
(enclosed accessories bag a) (fig. 5)
Fasten the handle to the U-bar with two cylindrical
screws.
9.3 Installing the protective guard (L)
(enclosed accessories bag b) (fig. 6 + 7)
1. Fit the protective guard (L) to the trunk guide plate
(5) and use the enclosed cylindrical screws and
nuts to affix it.
2. Undo the cylindrical screw with washer that is lo-
cated on the wheel bracket.
3. Fasten the other end of the strut to the protective
guard using the Phillips head screw and nut. (3)
4. Now guide the open end of the strut (O) between
the washer and the wheel bracket, tighten the cy-
lindrical screw (4) again firmly.
9.4 Installing the tray table (K + M) (enclosed ac-
cessories bag c + d + e) (fig. 8 + 9 + 10)
1. Attach the tray table (K) to the same side as the
protective guard (L). Use two cylindrical screws
and spring washers to affix the table to the log
splitter. (1)
2. Ensure that the table and the protective guard are
level in relation to each other.
3. Undo the screw on the left of the foot.
4. Fasten the other end of the strut to the protective
guard using the Phillips head screw and nut, align
everything and tighten the screws firmly.
5. Now guide the open end of the strut (N) between
the screw and the foot bracket, tighten the screw
slightly.
6. Repeat the process on the other side.
7. Align both tables in relation to each other and use
the Phillips head screws and nuts (e) to affix them.
 www.scheppach.com /  service@scheppach.com /  +(49)-08223-4002-99 /  +(49)-08223-4002-58
9.5 Installing the guard (E - J)
(enclosed accessories bag f) (fig. 11 + 12)
1. Connect the guards (H) and (I) together, use two
Phillips head screws, clamping brackets and nuts
to affix it.
2. Fasten the guards (H, I, J) to the holes provided
for this. These are on the side of the table and
the protective guard. Fasten the guard with seven
Phillips head screws, clamping brackets and nuts.
Fit the protective guard (G) to the control lever
protection (11) and use a Phillips head screw and
a nut to affix it.
3. Now fasten the guards (E + F) on the top. Fasten
them with eight Phillips head screws, clamping
brackets and nuts.
4. Fasten the guards (E + F) together using two Phil-
lips head screws, clamping brackets and nuts.
m IMPORTANT!
You must fully assemble the appliance before using it
for the first time!

10. Initial operation

Make sure the machine is completely and expertly
assembled. Check before every use:
• the connection cables for any defective spots
(cracks, cuts etc.).
• the machine for any possible damage.
• the firm seat of all bolts.
• the hydraulic system for leakage.
• the oil level and
• the safety devices
10.1 Checking the oil level (fig. 17)
The hydraulic unit is a closed system with oil tank, oil
pump and control valve. Check the oil level regularly
before every use. Too low an oil level can damage
the oil pump. The correct oil level is approx. 10 to 20
mm below the oil tank surface.
If the oil level is at the lower notch, then the oil level is
at a minimum. Should this be the case, oil must be im-
mediately added. The upper notch indicates the max-
imum oil level. The machine must be on level ground.
Screw in the oil dipstick fully, to measure the oil level.
10.2 Ventilation screw
Before operating your machine, the bleed screw (7)
should be loosened by some rotations until air can go
in and out of the oil tank smoothly. Failed to loosen the
bleed screw will keep the sealed air in hydraulic sys-
tem being compressed after being decompressed.
Such continuous compression/decompression will
blow out the seals of the hydraulic system and cause
permanent damage to your machine.
Before moving your machine, make sure the bleed
screw is tightened to avoid oil leaking from this point.
GB | 25

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

5905211901

Table des Matières