Preparation for installation
The controller is supplied in a special protective packing. If this
shows signs of damage which may have occurred during transport,
contact your local sales office. When unpacking the controller ensure
that it is not dropped or subjected to any form of impact. Do not
dispose of the packing materials in an unauthorized manner. The
material is 100 % recyclable and complies with EEC Directive 85/399.
Figure 1
Each controller is factory set for a specific power supply:
Check voltage selector window for correct set and connect power
cord.
Turbo-V 3K-T Rack Controller User Manual / 87-900-988-01 (D)
Controllers packing
model 869-9447 is factory set for 220 Vac operation
model 869-9547 is factory set for 120 Vac operation
Instructions for Use
Preparation for installation
16
195/260