9
4
3
1
È
a
1
1
5
8
6
7
2
É
a
4. Connect:
• Wiring harness coupler 1
• Warning indicator coupler 2
NOTE:
Tighten the plastic tie a after connecting the
wiring harness coupler.
5. Connect: (F80B, F100D)
• Variable trolling RPM switch coupler 1
6. Install:
• Grommet 1
• Fuel hose 2
• Battery cable 3
• Speedometer hose 4
• Wiring harness 5
• Variable trolling RPM switch lead (F80B,
F100D) and warning indicator lead 6
• Shift cable 7
• Throttle cable 8
• Immobilizer wiring harness 9
NOTE:
Align the taped end a of the battery cable with
the end of the grommet.
È F80B, F100D
É F115A
173
E