Opening The Device; Connecting The Device - Mennekes DELTA-BOX 92898 Notice D'installation Et De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

• Please make sure that mechanical stress (e.g. by means
of the device weight) is placed on the supply line when
hanging the device.
Accessories for your device and further product information
can be found in the current MENNEKES product catalogue
or online under www.MENNEKES.de.
2
Mount fastening elements (example: AirKRAFT®)
• Screw the screw-in hooks (1) in the borings (2) of the
enclosure.
• Hook the carabiners (3) in the hook-in screws.
• Fix the device to the carabiner (4) at the ceiling fastening.

5.4.4 Opening the device

For reasons of insertion and connection of the supply line
the device must be opened.
Opening AirKRAFT
and 3KRAFT
®
1
2
Opening the device
10
1
device
®
1
1
1
• Loosen the screws (1) and / or remove them with suited
tools.
• Swivel the upper enclosure section (2) open.
Opening the DELTA-BOX
4
3
Opening the device
• Remove the screws (1) with suited tools.
• Remove the enclosure cover (2).

5.4.5 Connecting the device

Switching off the supply voltage
Risk of loss of life from electric shock!
There is a risk of sustaining major injury or death when
working on or with live components.
• De-energise the supply line to the device prior to
commencing installation tasks.
• Secure the de-energised supply voltage connection point
2
against inadvertent reactivation by other persons.
• Check that the supply line is de-energised prior to
commencing installation tasks.
1
2
Danger

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

3kraft 94355si3kraft 94358geAirkraft 94566ge3kraft 94359roAirkraft 94555siAirkraft 94554si ... Afficher tout

Table des Matières