BWT A6X Notice Originale page 25

Adoucisseur domestique;
Masquer les pouces Voir aussi pour A6X:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Put the softener (1) in place
set and connect the brine valve (5)
15
9
19
18
connect the hydraulic block
21
23
Place the device in its definitive position (see
dimensions on the Scope of Delivery sheet)
The floor shall be clean and horizontal.
The controller unit (2) and the lid shall remain
accessible.
Open the salt lid (4), remove the cap (17), then
the brine valve (5) from its well (16).
Set the float height (X), rod pulled, at the value
9
provided on your Scope of Delivery sheet.
17
Check that the brining tube (9) is cut straight on
its ends, put it on the sheath (15), then tighten it
on the fitting located on the brine valve foot (18),
using the fly nut (19).
16
Put the brine valve (5) back into the bottom of the
well (16), pass the brining tube (9) through the
hole of the cap (17), then put this cap back upon
the well (16).
Pass the brining tube (9) through the dedicated
hole in the salt tank, making sure that this tube
does not bend anywhere.
Connect the brining tube (9) to the quick fitting
(20).
Connect the in and out flexible hoses (13) res-
22
pectively on the flange fittings (21) and (22) of
the hydraulic block.
20
Connect the drain tube (8) on the splined fitting
(23) and tighten it with a hose clamp (Serflex
type).
Connect the plug of the chlorination cell if your
24
softener has this option (24).
Manual soFTeNer A27-A6X code P0011144 - Rev 7 - 11/04/2018
25

Hide quick links:

Publicité

Chapitres

Table des Matières
loading

Table des Matières