2.3
Changes to the design / construction
Inspections by a technical expert are required before recommissioning (date, type of change, technical
expert signature).
______________________________________________________________________________________________________
______________________________________________________________________________________________________
Name, address of technical expert
_________________________________________________
Location, date
2.4
Changing the assembly location
Inspections by a technical expert are required before recommissioning (date, type of change, specialist
signature).
______________________________________________________________________________________________________
______________________________________________________________________________________________________
Name, address of technical expert
_________________________________________________
Location, date
78
_________________________________________________
Technical expert signature
_________________________________________________
Signature of Technical Expert of Safety inspections
OPI_SMART LIFT 2.30 SL-2.35 SL-2.40 SL_V3.1_DE-EN-FR-ES-IT