ATT Nussbaum SMART LIFT 2.30 Manuel D'exploitation page 124

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

A) Preparation
Ensure there is no load on the lift.
B) Unscrew cover panels
Allen key wrench 3 mm
C) Move the carrier arm upwards, then disconnect
the lift from mains power or lock the switch
124
D) P lug in the fixing bracket
E) If required, move the latch bar into position with
a nail puller
oder
OPI_SMART LIFT 2.30 SL-2.35 SL-2.40 SL_V3.1_DE-EN-FR-ES-IT
Fixing bracket
Nail puller

Publicité

Table des Matières
loading

Table des Matières