Hayward PHOENIX 2 Guide De L'utilisateur page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ÉTAPE 1
; connexion des tuyaux.
1.
2.
3.
ÉTAPE 3
; connexion de la tête.
4
STEP 2
STEP 2
1. Take the Leader Hose (the one with the gray cu ) and attach the oat halves 24 inches
(60 cm) from the gray end. OR if you have the 2 snap on oats snap them at 20 to 25
inches from the gray cu . This is the section of hose that attaches to the POOLCLEANER™
in Step 3. (We have already done this step for you).
Gray Cu
+1
STEP 2
STEP 2
4
Connecting the hoses . . .
1. Take the Leader Hose (the one with the gray cu ) and attach the oat halves 24 inches
(60 cm) from the gray end. OR if you have the 2 snap on oats snap them at 20 to 25
inches from the gray cu . This is the section of hose that attaches to the POOLCLEANER™
in Step 3. (We have already done this step for you).
Gray Cu
50-60 cm (20-25")
Connecting the hoses . . .
2. Connect all the hoses (except the Leader Hose).
Connect male to female. If need be wet the hoses
for easier assembly. Now connect Leader Hose to
the end.
3. The connected hoses should be one to two
lengths longer than the furthest point from the
vacuum source (skimmer or wall tting).
+1
2. Connect all the hoses (except the Leader Hose).
Connect male to female. If need be wet the hoses
for easier assembly. Now connect Leader Hose to
the end.
3. The connected hoses should be one to two
lengths longer than the furthest point from the
vacuum source (skimmer or wall tting).

Publicité

Table des Matières
loading

Table des Matières