Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 19
GETTING THE MACHINE READY TO MAKE COFFEE
The machine features two support positions for
different types of cups.
1
Espresso cup: Place the cup onto the cup grid.
1
COFFEE SUPPLY
1
Lift the pod loading lever.
The red light indicator will flash alternating with
the upper supply button to indicate the lever
opening.
Never put your fingers or any object into the
pod insertion compartment.
Only Lavazza BLUE pods shall be put inside the
pod insertion compartment.
2
Put the Lavazza BLUE pod inside the special
compartment available.
GETTING THE MACHINE READY
2

MAKING COFFEE

2
Large cups (diluted espresso):
– Remove the cup grid (figure 1).
– Turn the grid upside down by 180° (figure 2).
– Put the cup onto the plane (figure 4).
3
3
the machine is ready for supplying, i.e. the sup-
ply buttons shall light up steadily.
4
Press any of the buttons to start supplying.
Now the supply will start: the selected supply
button will flash.
E N
4
E N
15

Publicité

Table des Matières
loading

Table des Matières