12
4.3
Startup procedure
Before startup, all fitting and installation work must have been
completed and the immersion tube must be secured to the ball
valve with the safety chain!
3
4
1
4.4
Shutdown procedure
3
1
InTrac 787-01-CH
52 402 481
5
2. Open the ball valve.
3. Carefully push the immersion tube by
2
hand into the process.
4. Secure immersion tube in this position by
tightening the locking nut.
1
5. Shorten the safety chain to the shortest
possible length.
1. Loosen the locking nut.
2. Hold immersion tube, then disconnect
the safety chain.
2
3. Move immersion tube by hand to "Main-
tenance" position.
4. Close the ball valve.
4
© 05/10 Mettler-Toledo GmbH, CH - 8606 Greifensee
1. Warning! Close the valves on
both connections of the flush-
ing
chamber.
process media can escape
while the ball valve is opened!
5. Caution! Make sure that the
process vessel or line is in
a non-hazardous condition
(depressurized, empty, rinsed,
purged, etc.) when the housing
has to be removed.
Printed in Switzerland
InTrac
®
787
Otherwise