_IA_MCS.book Seite 15 Mittwoch, 28. Januar 2009 9:06 09
MCS5, MCS15
7
Unpacking and Inspection
8
Installation
d
Warning – danger of injury
The system may only be installed by qualified personnel from a specialist
company. The following information is intended for technicians who are
familiar with the guidelines and safety precautions to be applied.
Note
I
Review the following guidelines prior to and after installation.
Check all items against the packing list to ensure all cartons have
been received.
Move units in the normal "up" orientation as indicated by the arrows on
each carton.
Examine cartons for shipping damage, removing the units from the
cartons if necessary.
If the unit is damaged, the carrier should make the proper notation on
the delivery receipt acknowledging the damage.
Plan all connections which must be made including
– ducting,
– condensate drain,
– seawater in and out,
– electrical power connections,
– location of control,
– seawater pump placement,
to assure easy access for routing and servicing.
Unpacking and Inspection
15