Jotul GF 400 DV IVI Sebago Manuel D'installation Et D'utilisation page 2

Table des Matières

Publicité

139549-C GF 400 DV IPI 2/20
!
CE MANUEL DU PROPRIÉTAIRE FOURNIT DES INFORMA-
TIONS POUR ASSURER UNE INSTALLATION SÉCURITAIRE ET
UN FONCTIONNEMENT EFFICACE ET FIABLE DE VOTRE INSERT
DE CHEMINÉE. VEUILLEZ LIRE CES INSTRUCTIONS DANS LEUR
INTEGRALITE ET LES METTRE A LA DISPOSITION DE TOUTE PER-
SONNE UTILISANT OU ENTRETENANT CET INSERT A GAZ.
NE PAS ESSAYER DE MODIFIER OU DE MODIFIER LA CON-
STRUCTION DE CET APPAREIL OU DE SES COMPOSANTS. TOUTE
MODIFICATION OU MODIFICATION ANNULERA LA GARANTIE,
LA CERTIFICATION ET LA LISTE DE CET APPAREIL.
CET APPAREIL DE CHAUFFE DOIT ÊTRE INSTALLÉ ET ENTRETENU
PAR UN ORGANISME DE SERVICE QUALIFIÉ.
Suggested Tools for
Installation and Service
• External regulator (for Propane only)
• Piping which complies with local code
• Manual shut-off valve -
T-Handle required in Massachusetts
• Sediment trap - if required by code
• Tee joint
• Pipe wrench
• Pipe sealant
• 10 mm open end wrench
• 1/2", 7/16" open end wrench
• Phillips head screwdriver
2
WARNING
HOT GLASS WILL
CAUSE BURNS
DO NOT TOUCH GLASS
UNTIL COOLED.
NEVER ALLOW CHILDREN
TO TOUCH GLASS.
• Flat head screwdriver
• 1/4" nut driver
• Gloves
• Safety glasses
• Torx T-20 screwdriver
• Tin snips
.
GN / 68.19%
GP / 67.69%
Basé sur CSA P.4.1-15
Nous recommandons que
nos produits gazeux soient
installés et entretenus par
des professionnels certifiés
aux États-Unis par le
National Fireplace Institute®
(NFI) en tant que spécialistes
du gaz NFI.
Jøtul GF 400 DV IPI

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gf 400 dv ipi sebago

Table des Matières